
Public Information Session for Line 5 Tunnel
August 12 @ 6:00 pm - 7:00 pm
Free
EGLE invites the public to attend a virtual public information session to ask questions and learn information about the EGLE application submitted by Enbridge Energy to fill and construct in wetlands and place a water intake structure in Lake Michigan to facilitate the construction of the Line 5 Tunnel Project. This is an informational session only and will include a presentation followed by a question-and-answer session. An official public hearing will held virtually on Tuesday, August 19th to take verbal comments on the project. Information and registration for the public hearing can be found at https://bit.ly/4lzO1XF. In addition, information on the application can be found and official comments can also be made through EGLE’s MiEnviro database at https://mienviro.michigan.gov/ncore (click on “Public Notice Search” then search under EGLE Application/Submission number HQ3-8BYB-N9DT1). The project is located in T39N, R04W, Section 10, Wawatam and T40N, R04W in Moran Township, Emmet and Mackinac County, Michigan.
After registering, you will receive an email from “EGLE Outreach” with a link for you to use to join the meeting. Pre-registration is not required to attend the meeting. Individuals interested in participating can click on the registration link (https://bit.ly/453At0y) at the start of the event (6:00 pm).
Register HERE.